SN | Duration | Assignment Name | Executing Agency |
01 | 1981 to 1983 | Consultancy Services for Hobiganj Palli Biddut Samity, Rural Electrification Project in Hobiganj, Chunarughat, Bahubal, Madhabpur and Nabinagar Thanas. | BREB |
02 | 1983 to 1984 | Consultancy Services for Augmentation and Renovation of Electrical Distribution System of Mirpur Cantonment, Dhaka. | Bangladesh Army |
03 | 1983 to 1987 | Consultancy Services for Dinajpur Palli Biddut Samity-I, Rural Electrification project in Sadar Thana, Chirirbandar, Khansama, Bochaganj, Kaharole, Pirganj, Ranishankail, Haripur & Birol Thanas. | BREB |
04 | 1983 to 1990 | Consultancy Services for Pirojpur Palli Biddut Samity, Rural Electrification project in Bhandaria, Kawkhali, Swarupkathi and Rajapur Thanas. | BREB |
05 | 1984 to 1984 | Consultancy Services for Asset Valuation and Mapping Project of Dhaka Electric Supply (DES). | BPDB |
06 | 1985 to 1989 | Consultancy Services for 18-Town Power Distribution Project at Bogra, Rangpur, Dinajpur, Pabna, Serajganj, Saidpur, Jessore, Kustia, Rajbari, Barisal and Faridpur Towns. | BPDB |
07 | 1985 to 1992 | Consultancy Services for Construction Supervision of 71 MW Gas Turbine Power Station Project. Baghabari, Serajganj in association with EDF, France. | BPDB |
08 | 1985 to 2018 | Retainer Consultancy Services for Hobiganj PBS (Term 1 to 12). | BREB |
09 | 1986 to 1988 | Consultancy Services for Augmentation and Renovation of Electrical Distribution System of Dhaka Cantonment, Dhaka. | Bangladesh Army |
10 | 1986 to 1992 | Consultancy Services for 14-Town Power Distribution Project in Thakurgaon, Nilphamari & Parbatipur Town. | BPDB |
11 | 1987 to 1991 | Consultancy Services for North Bangladesh Tubewell Project at Boda, Atwari Thanas, Thakurgaon District. | BPDB |
12 | 1987 to 2018 | Retainer Consultancy Services for Jessore PBS-2 (Term 1 to 13). | BREB |
13 | 1987 to 2015 | Retainer Consultancy Services for Dinajpur PBS-1 (Term 1 to 12). | BREB |
14 | 1988 to 2005 | Consultancy Services for Jessore Palli Biddut Samity-II, (Jessore Rural Electrification Society) Rural Electrification Board. | BREB |
15 | 1989 to 1993 | Consultancy Services for 16-Town Power Distribution Project Phase-I at Ishurdi Town, Pabna. | BPDB |
16 | 1990 to 2005 | Consultancy Services for Manikganj Palli Biddut Samity, (Area Coverage Rural Electrification) in Manikganj Sadar, Daulatpur, Singair, Ghior, Saturia, Shibalay and Harirampur Thana. | BREB |
17 | 1991 to 2005 | Consultancy Services for Netrokona Palli Biddut Samity (Area Coverage Rural Electrification) in Netrokona Sadar, Atpara, Barhatta, Durgapur, Khaliajuri, Kalmakanda, Kendua, Madang, Mohanganj & Purbadhala Thana. | BREB |
18 | 1992 to 2018 | Retainer Consultancy Services for Netrokona PBS (Term 1 to 7). | BREB |
19 | 1993 to 1993 | Feasibility Study of Proposed Project for Intensification & Expansion of REB Programme. Feni, Noakhali, Laxmipur and Patuakhali. | BREB |
20 | 1995 to 1996 | Consultancy Services for Review, Analysis and Recommendation Concerning Needed Changes or Additions to REB E&M Instruction Series-100. | BREB |
21 | 1996 to 1997 | Consultancy Services for Feasibility Study of Greater Chittagong Power Distribution Project, Phase-III. | BPDB |
22 | 1996 to 1999 | Consultancy Services for Kurigram-Lalmonirhat Palli Biddut Samity (Area Coverage Rural Electrification) in Lalmonirhat, Aditmari, Kurigram, Chilmari, Rajarhat, Ulipur, Nageshwari & Bhurungamari. | BREB |
23 | 1997 to 2006 | Consultancy Services for Shariatpur Palli Biddut Samity (Area Coverage Rural Electrification). | BREB |
24 | 1998 to 2000 | Consultancy Services for Construction Supervision of 60 MW Shahjibazar Gas Turbine Power Plant Shahjibazar, Sylhet. | BPDB |
25 | 1999 to 2003 | Consultancy Services for 210 MW Siddhirganj Thermal Power Station Civil Construction Supervision Works. | BPDB |
26 | 1999 to 2018 | Retainer Consultancy Services for Kurigram-Lalmonrhat PBS (Term 1 to 6). | BREB |
27 | 2000 to 2001 | Consultancy Services for Feasibility study and preparation of Master Plan for 4x450MW CCPP and Design of 230/132/33KV Substation and 230KV & 132KV Transmission Lines and Development of Master Plan for Meghnaghat Power Plant Complex. | BPDB |
28 | 2000 to 2001 | Feasibility study and preparation of Master Plan & Drawing and Tender Document for 3X210MW STPS and Design of 230/132/33KV Substation and 230KV Transmission Lines for evacuation of power from Siddhirganj Power Plant to Haripur Power Plant and Meghnaghat Power Plants and also Hasnabad Grid & Maniknagor Grid. | BPDB |
29 | 2000 to 2001 | Consultancy Services for Distribution planning and associated works under the jurisdiction of DESCO in Mirpur Area. | DESCO |
30 | 2001 to 2003 | Consultancy Services for Technological Erection, Testing & Commissioning of 210MW STPS Project at Siddhirganj. | BPDB |
31 | 2002 to 2003 | Feasibility Study for 2 X 100MW Peaking Power Plant in the Dhaka Area under ADB Loan No : 150 1505 BAN (SF) : Ninth Power Project [Part : D] in Association with P.B Powers U.K. | BPDB |
32 | 2002 to 2004 | Consultancy Services for Design and Construction Supervision of River Crossing Towers for 33KV Source Lines for REB Substations. | BREB |
33 | 2002 to 2005 | Consultancy Services for 16-Town Power Distribution Project, Phase-II in sixteen towns throughout Bangladesh, Group – A,B,C,D,E,F | BPDB |
34 | 2003 to 2005 | Consultancy Services for construction Supervision of Tongi 80MW Gas Turbine Power Station at Tongi. | BPDB |
35 | 2006 to 2009 | Consultancy Services for Detail design checking and supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line and Grid Substations at Bogra (115 km). | PGCB |
36 | 2007 to 2016 | Consultancy Services for 10-Town Power Distribution System Development Project, BPDB under ADB Loan. | BPDB |
37 | 2008 to 2009 | Consultancy Services for 33KV Sub-transmission Network Development study of Group-C (16 PBSs of Sylhet-Chittagong Division) under System loss Reduction Project, World Bank Loan. | BREB |
38 | 2010 to 2010 | Preparation of Feasibility Report & Bid Document for IPP Project of HFO Fuelled Power Plant at Barisal 50 MW (±10%), Chittagong 100 MW (±10%), Khulna 100 MW (±10%) on a Build, own and operate basis undertaken by BPDB for KDS and PHP Group. | BPDB |
39 | 2010 to 2014 | Feasibility Study, site selection, Environmental Impact Assessment (IEE, EIA & SIA), Preparation of Tender Document and Supervision & Commissioning of 20 MW (±10%) Dual Fuel Power Plant at Rauzan, Chittagong. | RPCL |
40 | 2010 to 2014 | Consultancy Services for Feasibility Study, site selection, Environmental Impact Assessment (IEE, EIA & SIA), Preparation of Tender Document and Supervision & Commissioning of 50 MW (±10%) Dual Fuel Power Plant at Kadda, Gazipur. | RPCL |
41 | 2011 2013 | Consultancy Services for Detail design checking & Supervision of 400KV Kaliakoir to Bibiyana Transmission line (182km) and Associated 400 kV /230 kV /132 kV/ 33 kV substations at Kaliakoir and Bibiyna. Funded by EDCF, Korea. |
PGCB |
42 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Kurigram-Lalmonirhat Palli Bidyut Samity under REE-RRDP-1 Project. | BREB |
43 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Netrakona Palli Bidyut Samity under REE-DDP-1 Project. | BREB |
44 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Manikganj Palli Bidyut Samity under REE-DDP-1 Project. | BREB |
45 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Jessore Palli Bidyut Samity-2 under REE-KDP-1 Project. | BREB |
46 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Dinajpur Palli Bidyut Samity-1 under REE-RRDP-1 Project. | BREB |
47 | 2011 to 2014 | Consultancy Services for Engineering, Supervision and Design for Electrical Distribution System of Hobigonj Palli Bidyut Samity under REE-CSDP-1 Project. | BREB |
48 | 2011 to 2016 | Consultancy Services for Central Zone Power Distribution System Development Project, BPDB Package-2, under JICA Loan. | BPDB |
49 | 2012 to 2015 | Consultancy Services for “Turnkey Contract for Design, Supply, Construction, Installation, Testig & Commissioning of River Crossing Tower and Commissioning of 33 KV Switching Station on Turnkey Basis at Manikganj 132/33 kV. 2×35/50 mvA Grid Sub-Station” under Manikganj PBS. | BREB |
50 | 2012 to 2015 | Consultancy Services for “Turnkey Contract for Survey, Supply, Carrying & Installation of River Crossing Tower and Commissioning of 33 KV Double circuit Transmission Line including Civil Construction our Kaliganga River near Tora Bridge under Manikganj PBS. | BREB |
51 | 2012 to 2018 | Retainer Consultancy Services for Barisal PBS-1 (Term 1 to 2) | BREB |
52 | 2012 to 2016 | Consultancy Services for Survey, Design and Construction Supervision Consulting Services (3 PBSs) for Rural Electrification Up-gradation Project. (Dinajpur-1, Kurigram-Lalmonirhat PBS & Jessore-PBS-2) Under JICA Loan. | BREB |
53 | 2012 to 2017 | Consulting Services of Electrical Distribution System of Hobigonj PBS, Dinajpur PBS-1, Jessore PBS-2, Manikgonj PBS, Netrakona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1 under 1.8 Million Consumer Connection Through Rural Electrification Expansion Project. | BREB |
54 | 2013 to 2013 | Bangladesh Power System Expansion and Efficiency Improvement Investment Program under ADB. | Power Cell |
55 | 2013 to 2016 | Consultancy Services for Central Zone Power Distribution System Development Project, BPDB Package-6, under JICA Loan. | BPDB |
56 | 2015 to 2016 | Consultant for Consulting Services for Layout Master Plan for the Ghorashal, Goalpara and Baghabari Generation Hubs. | Power Cell |
57 | 2015 to 2016 | Consultancy Services for Feasibility Study for Installation of 50MW Power Plant (Duel Fuel) for Chittagong Port Authority. | CPA |
58 | 2016 to 2016 | Verification and Validation of Draft Commercial contract of “Power Grid Network Strengthening Project” Under Power Grid Company of Bangladesh (PGCB) Limited. | PGCB |
59 | 2016 to 2018 | Feasibility Study of Fuel supply route for 230MW Power Plant (Duel Fuel) at Kadda, Gazipur under Nexif Energy Pte., Singapore. | RPCL |
60 | 2017 to 2018 | Consultancy Services for Feasibility Study, Preparation of Detailed Drawing, Design and Estimate of Underground Electric Distribution Network in DESCO Area. | DESCO |
61 | 2019 to 2019 | Consultancy Services for Southwest Transmission Grid Expansion Project under ADB for West Zone Underground Power Distribution Network. | ADB, 6 ADB Avenue Mandaluyong City 1550 Metro Manila,Philippine. |
62 | 2017 to 2019 | Consultancy services for Enhancement of Capacity of Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution (T&D) project. Funded by World Bank | PGCB |
63 | 2020 to 2020 | Consultancy Service on Verification of Draft commercial contract of Power Grid Network Strengthening project Under PGCB (DPDC Area). | PGCB |
64 | 2019 to 2020 | Consulting Firm for Analysis of Transmission and Distribution Losses and Establishing Loss Targets. Funded by ADB | Power Cell |
65 | 2017 to 2020 | Technical Proposal Submission Selection of Consultancy Services for Study, Planning and Improvement of BREB/PBS Distribution System by (A) Review and update the existing methodology/software used in computing SAIDI & SAIFI (B) Improved/Automated data Acquisition and control (c) Improved Network Protection. Funded by World Bank | BREB |
66 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Manikgonj Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Dhaka, Mymensingh, Chittagong & Sylhet Division)” Project. Funded by ADB | BREB |
67 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Jessore Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Rajshahi, Rangpur, Khulna & Barisal Divisions)” Project. Funded by ADB | BREB |
68 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Hobigonj Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Dhaka, Mymensingh, Chittagong & Sylhet Division)” Project. Funded by ADB | BREB |
69 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Netrakona Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Dhaka, Mymensingh, Chittagong & Sylhet Division)”. Funded by ADB | BREB |
70 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Kurigram-Lalmonirhat Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Rajshahi, Rangpur, Khulna & Barisal Divisions)” Project. Funded by ADB | BREB |
71 | 2017 to 2021 | Consultant Services of Engineering Supervision & Design for Electrical Distribution System of Barisal Palli Bidyut Samity under “Up-gradation, Rehabilitation and Intensification of Distribution System (Rajshahi, Rangpur, Khulna & Barisal Divisions)” Project. Funded by ADB | BREB |
72 | 2016 to 2021 | Electrical Consultancy services of Hobigonj PBS Under Rural Electrification Expansion Program in Sylhet Division and Infrastructure Development of BREB Headquarter. | BREB |
73 | 2016 to 2021 | Electrical Consultancy services of Netrakona PBS Under Rural Electrification Expansion Program in Sylhet Division and Infrastructure Development of BREB Headquarter. | BREB |
74 | 2017 to 2022 | Consultancy services of package no. DNE (W)-S-27 (Jessore PBS-2) under Distribution Network Expansion for 100% Rural Electrification Program (Rajdhahi, Rangpur, Khulna & Barishal Divisions). | BREB |
75 | 2017 to 2022 | Consultancy services of package no. DNE (E)-S-10 (Manikgonj PBS) under Distribution Network Expansion for 100% Rural Electrification Program (Dhaka, Mymensingh, Chittagong & Sylhet Divisions). | BREB |
76 | 2017 to 2022 | Consultancy services of package no. DNE (E)-S-23 (Netrokona (Atpara, Kendua)) under Distribution Network Expansion for 100% Rural Electrification Program (Dhaka, Mymensingh, Chittagong & Sylhet Divisions) | BREB |
77 | 2017 to 2022 | Consultancy services of package no. DNE (E)-S-24 (Netrokona (Netrokona Sadar, Purbodhala, Durgapur, Kalmakanda, Mohongonj, Barahatta)) under Distribution Network Expansion for 100% Rural Electrification Program (Dhaka, Mymensingh, Chittagong & Sylhet Divisions). | BREB |
78 | 2017 to 2022 | Consultancy services of package no. DNE (W)-S-04 (Kurigram Lal PBS) ( Aditmari, Kaligonj, Lalmonirhat Sadar, Nageshwori)) under Distribution Network Expansion for 100% Rural Electrification Program (Rajshahi, Rangpur, Khulna, & Barishal Divisions). | BREB |
79 | 2017 to 2022 | Consultancy services of package no. DNE (W)-S-05 (Kurigram Lal PBS) (Burungamari, Kurigram sadar, Ulipur, Chilmari, Sundorgonj)) under Distribution Network Expansion for 100% Rural Electrification Program. (Rajshahi, Rangpur, Khulna, & Barishal Divisions). | BREB |
80 | 2017 to 2022 | Consultancy services of package no. DNE (W)-S-34 (Barishal PBS-1) under Distribution Network Expansion for 100% Rural Electrification Program (Rajshahi, Rangpur, Khulna, & Barishal Divisions). | BREB |
81 | 2023 to 2023 | Consultancy Services for Setting up Electrical Testing Laboratory. Funded by World Bank | Power Cell |
82 | 2019 to 2024 | Consulting Firm for Owner’s Engineer for Construction of Khulna 330MW Dual Fuel Combined Cycle Project. Funded by China Exim Bank | BPDB |
83 | 2018 to 2024 | Consultancy Services for Survey, Planning, Design and Supervision of Line Construction and Renovation Works of Power Distribution System Development Project, Cumilla Zone, BPDB. | BPDB |
84 | 2021 to 2024 | Consultancy Services for Engineering Support and Supervision of 400kV Sub- stations (Bogura & Rahanpur 400 kV/230 kV GIS Sub-station and Augmentation of Gopalganj 400 kV/230 kV GIS Sub-station) under Southwest Transmission Grid Expansion Project. Funded by ADB. | PGCB |