- Construction Supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line
- Construction Supervision of 400KV Kaliakoir to Bibiyana Transmission line
- Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution
- Retainer Consultancy Services for Barisal PBS -1 (2nd Term)
- Retainer Consultancy Services for Kurigram-Lalmonirhat PBS (6th Term)
- Retainer Consultancy Services for Netrokona PBS (5th Term)
- Retainer Consultancy Services for Manikganj PBS (7th Term)
- Retainer Consultancy Services for Jessore PBS-2 (11th Term)
- Retainer Consultancy Services for Hobiganj PBS (12th Term)
- Electrical Distribution System of Hobiganj PBS, Dinajpur PBS-1, Jashore PBS-2, Manikgonj PBS, Netrokona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1
- 10-Town Power Distribution System Development Project (ADB)
- Power Distribution System Development Project, Package-6 (JICA)
- Power Distribution System Development Project, Package-2 (JICA)
- Design and Estimate of Underground Electric Distribution Network (DESCO)
- Southwest Transmission Grid Expansion Project (ADB)
- Distribution Network Expansion for 100% Rural Electrification Program
Construction Supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line
Duration | Assignment Name |
Name of Client |
April 2006 to March 2009 | Consultancy Services for Detail design checking and Construction Supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line (115 km) and 230KV/132KV Grid Sub-stations at Bogra. | PGCB |
Brief Description |
i) Consultancy Services for Checking of detail Planning & design. |
ii) Supervision of Construction Works including testing and commissioning. |
iii) New 230 kV double circuit Transmission Line between Baghabari –Serajgonj – Bogra 115 km |
iv) New 230/132KV Sub-station at Bogra |
Construction Supervision of 400KV Kaliakoir to Bibiyana Transmission line
Duration | Assignment Name |
Name of Client |
December 2011 to June 2017 | Consultancy Services for Detail design checking & Construction Supervision of 400KV Kaliakoir to Bibiyana Transmission line (182km) and Associated 400KV/ 230KV/ 132KV Sub-station at Kaliakoir and Bibiyna. Funded by EDCF, Korea. | PGCB |
Brief Description |
i) Consultancy Services for Checking of detail Planning & design. |
ii) Supervision of Construction Works including testing and commissioning. |
Transmission Line: 400kV double circuit Kaliakoir to Bibiyana 339 km. |
Grid Sub-station: Bibiyana 400/230 kV, 400/235/33 kV, 400/520 MVA Transformer (Three Phase), 1 No. and Kaliakoir 400/230/132 kV, Transformers 400/138/33 kV, 250/325 MVA (Three Phase)-2 (Two) No. & 400/235/33 kV, 400/520 MVA (Three Phase)-1 No. |
Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution
Duration | Assignment Name |
Name of Client |
March 2017 to September 2019 | Enhancement of Capacity of Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution (T&D) project. Funded by World Bank | PGCB |
Brief Description |
i) Consultancy Services for Checking of detail Planning & design. |
ii) Supervision of Construction Works including testing and commissioning. |
Transmission Line: New 132kV- 250kM and Re-conduct ring 132kV = 150kM |
Sub-station: New 230/132kV GIS = 1 No. & 132/33kV = 3 Nos. Up-gradation 132/33kV = 5 Nos. and 132/33kV Switching Station = 2 Nos. |
Retainer Consultancy Services for Barisal PBS -1 (2nd Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Jessore PBS-2 (11th Term). | Barisal PBS-1 under BREB |
Brief Description |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Retainer Consultancy Services for Kurigram-Lalmonirhat PBS (6th Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Jessore PBS-2 (11th Term). | Kurigram-Lalmonirhat PBS under BREB |
Brief Description |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Retainer Consultancy Services for Netrokona PBS (5th Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Netrokona PBS (5th Term). | Netrokona PBS under BREB |
Brief Description |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Retainer Consultancy Services for Manikganj PBS (7th Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Manikganj PBS (7th Term). | Manikganj PBS under BREB |
Brief Description |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Retainer Consultancy Services for Jessore PBS-2 (11th Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Jessore PBS-2 (11th Term). | Jessore PBS – 2 under BREB |
Brief Description |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Retainer Consultancy Services for Hobiganj PBS (12th Term)
Duration | Assignment Name |
Name of the Employer |
July 2015 to June 2018 | Retainer Consultancy Services for Hobiganj PBS (12th Term). | Hobiganj PBS under BREB |
Brief Description |
Preparation of master plan and Review of Master Plan of PBS System. |
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. |
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System. |
Field data collection by GPS machine of PBS Distribution system. |
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc. |
Construction Supervision of new lines and Sub-station. |
Digitization of key map & detail map and As-built single line with operational diagram. |
Preparation of study report (System Loss, Voltage drop, Power factor and any other study). |
Load survey & load forecast, load flow studies & sectionalizing studies. |
Preparation of As-built staking sheet and Preparation of Close-out Document etc. |
Electrical Distribution System of Hobiganj PBS, Dinajpur PBS-1, Jashore PBS-2, Manikgonj PBS, Netrokona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1
Duration | Assignment Name |
Name of the Employer |
September 2012 to June 2017 | Consultancy Services for Engineering Supervision & Design of Electrical Distribution System of Hobiganj PBS, Dinajpur PBS-1, Jashore PBS-2, Manikgonj PBS, Netrokona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1 under 1.8 Million Consumer Connections Through Rural Electrification Expansion Project. | BREB |
Brief Description |
Field Investigation, load data collection & Re-design of distribution System. |
Design & Preparation of staking sheet new/renovation/up-gradation/re-conducting/neutral installation of 33 & 11 kV and LT Line. |
Preparation of BOQ and Bill of Materials. |
Construction Supervision including inspection of materials and workmanship of Contractor for all HT and LT lines Preparation of as-built staking sheet and Preparation of Close-out document. |
10-Town Power Distribution System Development Project (ADB)
Duration | Assignment Name |
Name of the Employer |
October 2006 to June 2016 | Consultancy Services for 10-Town Power Distribution System Development Project, under ADB Loan. | BPDB |
Brief Description |
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list. |
Load reading & survey and load forecast. |
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020. |
Voltage drops & technical loss calculation. |
Preparation of bill of quantities and tender documents for distribution lines. |
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document. |
Power Distribution System Development Project, Package-6 (JICA)
Duration | Assignment Name |
Name of the Employer |
December 2013 to June 2016 | Consultancy Services for Central Zone Power Distribution System Development Project, Package-6 under JICA Loan. | BPDB |
Brief Description |
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list. |
Load reading & survey and load forecast. |
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020. |
Voltage drops & technical loss calculation. |
Preparation of bill of quantities and tender documents for distribution lines. |
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document. |
Power Distribution System Development Project, Package-2 (JICA)
Duration | Assignment Name |
Name of the Employer |
March 2011 to December 2016 | Consultancy Services for Central Zone Power Distribution System Development Project, Package-2 under JICA Loan. | BPDB |
Brief Description |
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list. |
Load reading & survey and load forecast. |
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020. |
Voltage drops & technical loss calculation. |
Preparation of bill of quantities and tender documents for distribution lines. |
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document. |
Design and Estimate of Underground Electric Distribution Network (DESCO)
Duration | Assignment Name |
Name of the Employer |
March 2017 to December 2017 | Consultancy Services for Feasibility Study, Preparation of Detailed Drawing, Design and Estimate of Underground Electric Distribution Network in DESCO Area. | DESCO |
Brief Description |
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list, Database and Plan for undergrounding Works. |
Feasibility study of the underground Distribution system in Uttara 3rd phase and Purbachal New Town area in DESCO. |
Preparation of BOQ, Cost Estimation, Bid Document etc. for Existing Distribution Network and Proposed system. |
Drawing, design and estimation for construction of underground distribution system of the Gulshan, Banani, Baridhara and Uttara Zone of DESCO should be done considering cable ducting system. |
Environmental and Social study including Financial and Economic Analysis. |
Financial and Economic Analysis. |
Southwest Transmission Grid Expansion Project (ADB)
Duration | Assignment Name |
Name of the Employer |
May 2019 to December 2019 | Consultancy Services for TA-9342 BAN: Southwest Transmission Grid Expansion Project (51137-002) for West Zone Underground Power Distribution Network under ADB | ADB |
Brief Description |
Detail survey of existing distribution system by using Hand GPS Machine. |
Feasibility assessment for the construction of underground distribution networks in the urban cities of Khulna, Jessore and Barisa under WZPDCL. |
Preparation of BOQ, Cost Estimation for Existing Distribution Network and Proposed system. |
Drawing, design for construction of underground distribution system in WZPDCL should be done considering cable ducting system. |
Environmental and Social study including Financial and Economic Analysis. |
Single Line Diagram of existing infrastructure and proposed infrastructure. |
Distribution Network Expansion for 100% Rural Electrification Program
Duration | Assignment Name |
Executing Agency |
July 2017 to December 2020 | Consultant Services for Hobigonj PBS, Jessore PBS II, Manikgonj PBS, Netrakona PBS, Kurigram-Lalmonirhat PBS & Barisal under Distribution Network Expansion for 100% Rural Electrification Program. | BREB |
Brief Description |
Design & Preparation of staking sheet new 33& 11 kV and LT Line. |
Preparation of BOQ and Bill of Materials. |
Construction Supervision including inspection of materials and workmanship of Contractor for all HT and LT lines Preparation of as-built staking sheet and Preparation of Close-out document. |