Construction Supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line
Duration Assignment Name
Name of Client
April 2006 to March 2009 Consultancy Services for Detail design checking and Construction Supervision of 230 KV Baghabari-Serajgonj-Bogra Transmission Line (115 km) and 230KV/132KV Grid Sub-stations at Bogra. PGCB
Brief Description
i) Consultancy Services for Checking of detail Planning & design.
ii) Supervision of Construction Works including testing and commissioning.
iii) New 230 kV double circuit Transmission Line between Baghabari –Serajgonj – Bogra 115 km
iv) New 230/132KV Sub-station at Bogra
Construction Supervision of 400KV Kaliakoir to Bibiyana Transmission line
Duration Assignment Name
Name of Client
December 2011 to June 2017 Consultancy Services for Detail design checking & Construction Supervision of 400KV Kaliakoir to Bibiyana Transmission line (182km) and Associated 400KV/ 230KV/ 132KV Sub-station at Kaliakoir and Bibiyna. Funded by EDCF, Korea. PGCB
Brief Description
i) Consultancy Services for Checking of detail Planning & design.
ii) Supervision of Construction Works including testing and commissioning.
Transmission Line: 400kV double circuit Kaliakoir to Bibiyana 339 km.
Grid Sub-station: Bibiyana 400/230 kV, 400/235/33 kV, 400/520 MVA Transformer (Three Phase), 1 No. and Kaliakoir 400/230/132 kV, Transformers 400/138/33 kV, 250/325 MVA (Three Phase)-2 (Two) No. & 400/235/33 kV, 400/520 MVA (Three Phase)-1 No.
Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution
Duration Assignment Name
Name of Client
March 2017 to September 2019 Enhancement of Capacity of Grid Substations and Transmission Lines for the Rural Electricity Transmission and Distribution (T&D) project. Funded by World Bank PGCB
Brief Description
i) Consultancy Services for Checking of detail Planning & design.
ii) Supervision of Construction Works including testing and commissioning.
Transmission Line: New 132kV- 250kM and Re-conduct ring 132kV = 150kM
Sub-station: New 230/132kV GIS = 1 No. & 132/33kV = 3 Nos.
Up-gradation 132/33kV = 5 Nos. and 132/33kV Switching Station = 2 Nos.
Retainer Consultancy Services for Barisal PBS -1 (2nd Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Jessore PBS-2 (11th Term). Barisal PBS-1 under BREB
Brief Description
 
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Retainer Consultancy Services for Kurigram-Lalmonirhat PBS (6th Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Jessore PBS-2 (11th Term). Kurigram-Lalmonirhat PBS under BREB
Brief Description
 
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Retainer Consultancy Services for Netrokona PBS (5th Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Netrokona PBS (5th Term). Netrokona PBS under BREB
Brief Description
 
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Retainer Consultancy Services for Manikganj PBS (7th Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Manikganj PBS (7th Term). Manikganj PBS under BREB
Brief Description
 
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Retainer Consultancy Services for Jessore PBS-2 (11th Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Jessore PBS-2 (11th Term). Jessore PBS – 2 under BREB
Brief Description
 
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Retainer Consultancy Services for Hobiganj PBS (12th Term)
Duration Assignment Name
Name of the Employer
July 2015 to June 2018 Retainer Consultancy Services for Hobiganj PBS (12th Term). Hobiganj PBS under BREB
Brief Description
Preparation of master plan and Review of Master Plan of PBS System.
Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works.
Feasibility study for Proposed Distribution Network and Preparation of master plan and Review of Master Plan of PBS System.
Field data collection by GPS machine of PBS Distribution system.
Preparation of staking sheet and BOQ, Cost Estimation, Bid Document etc.
Construction Supervision of new lines and Sub-station.
Digitization of key map & detail map and As-built single line with operational diagram.
Preparation of study report (System Loss, Voltage drop, Power factor and any other study).
Load survey & load forecast, load flow studies & sectionalizing studies.
Preparation of As-built staking sheet and Preparation of Close-out Document etc.
Electrical Distribution System of Hobiganj PBS, Dinajpur PBS-1, Jashore PBS-2, Manikgonj PBS, Netrokona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1
Duration Assignment Name
Name of the Employer
September 2012 to June 2017 Consultancy Services for Engineering Supervision & Design of Electrical Distribution System of Hobiganj PBS, Dinajpur PBS-1, Jashore PBS-2, Manikgonj PBS, Netrokona PBS, Kurigram-Lalmonirhat PBS & Barisal PBS-1 under 1.8 Million Consumer Connections Through Rural Electrification Expansion Project. BREB
Brief Description
Field Investigation, load data collection & Re-design of distribution System.
Design & Preparation of staking sheet new/renovation/up-gradation/re-conducting/neutral installation of 33 & 11 kV and LT Line.
Preparation of BOQ and Bill of Materials.
Construction Supervision including inspection of materials and workmanship of Contractor for all HT and LT lines Preparation of as-built staking sheet and Preparation of Close-out document.
10-Town Power Distribution System Development Project (ADB)
Duration Assignment Name
Name of the Employer
October 2006 to June 2016 Consultancy Services for 10-Town Power Distribution System Development Project, under ADB Loan. BPDB
Brief Description
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list.
Load reading & survey and load forecast.
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020.
Voltage drops & technical loss calculation.
Preparation of bill of quantities and tender documents for distribution lines.
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document.
Power Distribution System Development Project, Package-6 (JICA)
Duration Assignment Name
Name of the Employer
December 2013 to June 2016 Consultancy Services for Central Zone Power Distribution System Development Project, Package-6 under JICA Loan. BPDB
Brief Description
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list.
Load reading & survey and load forecast.
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020.
Voltage drops & technical loss calculation.
Preparation of bill of quantities and tender documents for distribution lines.
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document.
Power Distribution System Development Project, Package-2 (JICA)
Duration Assignment Name
Name of the Employer
March 2011 to December 2016 Consultancy Services for Central Zone Power Distribution System Development Project, Package-2 under JICA Loan. BPDB
Brief Description
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list.
Load reading & survey and load forecast.
Detail planning and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2020.
Voltage drops & technical loss calculation.
Preparation of bill of quantities and tender documents for distribution lines.
Project management, monitoring, construction supervision including As build staking sheet and preparation of close-out document.
Design and Estimate of Underground Electric Distribution Network (DESCO)
Duration Assignment Name
Name of the Employer
March 2017 to December 2017 Consultancy Services for Feasibility Study, Preparation of Detailed Drawing, Design and Estimate of Underground Electric Distribution Network in DESCO Area. DESCO
Brief Description
Detail field survey and Inventory of existing distribution system prepare a Single Line Diagram, Material list, Database and Plan for undergrounding Works.
Feasibility study of the underground Distribution system in Uttara 3rd phase and Purbachal New Town area in DESCO.
Preparation of BOQ, Cost Estimation, Bid Document etc. for Existing Distribution Network and Proposed system.
Drawing, design and estimation for construction of underground distribution system of the Gulshan, Banani, Baridhara and Uttara Zone of DESCO should be done considering cable ducting system.
Environmental and Social study including Financial and Economic Analysis.
Financial and Economic Analysis.
Southwest Transmission Grid Expansion Project (ADB)
Duration Assignment Name
Name of the Employer
May 2019 to December 2019 Consultancy Services for TA-9342 BAN: Southwest Transmission Grid Expansion Project (51137-002) for West Zone Underground Power Distribution Network under ADB ADB
Brief Description
Detail survey of existing distribution system by using Hand GPS Machine.
Feasibility assessment for the construction of underground distribution networks in the urban cities of Khulna, Jessore and Barisa under WZPDCL.
Preparation of BOQ, Cost Estimation for Existing Distribution Network and Proposed system.
Drawing, design for construction of underground distribution system in WZPDCL should be done considering cable ducting system.
Environmental and Social study including Financial and Economic Analysis.
Single Line Diagram of existing infrastructure and proposed infrastructure.
Distribution Network Expansion for 100% Rural Electrification Program
Duration Assignment Name
Executing Agency
July 2017 to December 2020 Consultant Services for Hobigonj PBS, Jessore PBS II, Manikgonj PBS, Netrakona PBS, Kurigram-Lalmonirhat PBS & Barisal under Distribution Network Expansion for 100% Rural Electrification Program. BREB
Brief Description
Design & Preparation of staking sheet new 33& 11 kV and LT Line.
Preparation of BOQ and Bill of Materials.
Construction Supervision including inspection of materials and workmanship of Contractor for all HT and LT lines Preparation of as-built staking sheet and Preparation of Close-out document.